Designed for Seismic Zone 1 1 1 – safe against earthquakes
3.
Post Tensioned Flat Slabs – No beams and hence large floor clearances
4.
10 meter clear column Grids with large column free spaces
5.
Individual Floor Height – 3300mm roof slab to roof slab
6.
Large Areas of Glass Facades – Imposing Elevation
7.
Granite / Marble / Vitrified Tile Flooring in Lobbies and Staircases
8.
Granite / Marble Cladding for lift facia in lobbies
9.
Vitrified / Ceramic Tile Flooring and 7 feet high Dadoing in Toilets
10.
Painting in Emulsion over Putty in Common Areas
Features
Plumbing / Sanitary
:
Water requirements designed @ 45 liters per day per head
Parry ware / Hindustan White Sanitary Ware
Jaguar Chronium Plated Continental Range Fittings
Separate Toilet for Physically Challenged
Sewage Treatment Plant – for use of recycled water for flushing / gardening
Fire Fighting
:
Modern Automatic System strictly conforming to NBC 2005
Full Fledged Hydrant System – Wet Risers to cover entire floor of the Building
First Aid Hose Reel,Landing Valves / CP Hoses at each floor
Ring Main around the building with additional Fire Brigade inlets for external source of fire protection
100% Backup Pumping Units on alternate power source with motor control and center panels and individual panels for diesel and jockey pumps
Automatic Sprinkler System for ground / Stilt floor with Dedicated Pumping Units and with 100% backup
Early warning microprocessor Detection System with individual control panel with imported Edwards system panel
Air Conditioning
:
Full Air Conditioned Office Space - Total Calculated Load : 352TR. – 44 Ton for 1st & 10th floors each &33 Ton per floor for 2nd to 9th floors
Designed for Inside Ambient Temperature of 24 degrees (plus or minus 2 degrees) Celsius by industry average.
Air Conditioning distribution upto AHUs only. Distribution into office areas from AHU Rooms,Ducting,Branching,Diffusers etc.are under client’s scope
Dedicaated earth pits is under client’s scope
Electrical Lighting
:
Design connected lighting load of 10KW per floor.Design lighting level – 300 LUX.
Designed for LT power supply & provision given for upgrading to HT supply if block booking of at least five floors is made by a single client.
Distribution cable from EB room to individual plate provided.All internal office cabling & switches are under client’s scope.
Only shaft provision given.Distribution / Cabling are under client’s Scope.
UPS
:
Centralized Location of UPS possible for each floor plate.
UPS shaft provided.
Total Load includes provision for ups for Data Room.
Common Service
:
Common Area lighting, Car Park lighting, lifts,water & fire fighting pumps,ETP, STP etc. provided
Sufficient capacitor for APFC power factor compensation for the reactive loads provided.Any extra compensation required at each floor level is not covered.
EB Supply
:
The total connected load: 1500 KVA approx.(excluding common area)
Active load: 1050 KVA approx (@75 KVA per floor plate)
Transformer capacity: 1250 KVA approx + 200 KVA for Common Area
DG for 100% Back up:
:
100% backup including for air conditioning.
Capacity : 1No – 1010 KVA + 200 KVA for Common Area