Brick Work in C.M using stock bricks or fly ash Cement blocks
Door Frames
:
Main Door in T.W. Other Doors in C.W.
Door Shutters
:
Imported Skin Main Door Shutters
Windows
:
C.W. w ith M .S. Grills and Glazed Shutters
Kitchen
Polished Granite Platform with Stainless Steel Sink,Ceramic Tiles Dadoing
Toilets
:
Ceramic Tiles Flooring, Glazed Tiles & Dadoing with Good Quality Sanitary Fittings.
Flooring
:
Vitrified tiles flooring inside Flats. Granite Flooring for Ground floor lobby & natural stone such as Shahabadstone flooring for staircase and common lobbies.
Electricity
:
Three Phase Electric Supply with Concealed Copper Wiring, Circuit Breaker & Modular Switches. A .C. Point in Bedrooms
Finishing
:
Internal walls finished with wall patty and painted with Emulsion paint. External walls finished with Antifungal
m att paint.
Doors & Windows
:
Enamel Paint.
Main Door
:
Varnish Sealer Finish.
Water Supply Arrangements
:
Sump to receive Metro Water, Bore Well / Open Well for Tapping Ground Water.
Other Features
:
5 Passenger Lift of Reputed Make Access control with Video Door Phone. Pathway with interlocking pavers. Pleasant Landscaping.
Service Connection Charges, Fees, Deposits and Incidental Expenses
for Electricity, Water Supply, Drainage and Cost of Rain Water
Harvesting System.
PROJECT STATUS
Status As on 31st May 2008
CLICK HERE TO DOWNLOAD
467KB
"The details shown in this page are for the purpose of illustration only. The information contained herein is subject to change and cannot form part of an agreement or contract."